Step 1.
Check the boards and make sure that the surface has no transport
damaging before you start. After cleaning the subfloor you can roll over the plastic foil and underlay material.The plastic foil has to overlap minimum 20 cm.
Step 2.
DOOR MOULDINGS AND SKIRTINGS : lay a board (with the decorative side down) next to the door moulding and saw as shown in the figure. Then slide the floor board under the moulding.
Step 3.
FIRST ROW : Begin laying in the left- hand corner, tongue-side against the wall. Make sure you are placing the short side of the board 8- 10 mm from the wall. The long side distance can be pushed into place when  three rows have been place (Mind distance of 8- 10 mm). If the wall is uneven, the floorbards must be
adapted to its contours. Remove the first row. Cut the floorboards as required and then relay them by sliding them in at an angle under the floorboards that are already in position.
Step 4.
END SECTION : Press the end section of the next floorboard at an angle to the first one, then lay down.Complete the first row in the same matter.
Step 5.
Place the final floorboard face down and the short side without the locking strip towards the wall. The distance to the wall must be 8- 10 mm. Mark where the floorboard is to be cut.
Step 6.
CUTTING THE FLOORBOARDS : Place the floorboard face down on the work surface and cut to size using a jig- saw. Use a fine-toothed type if you are using a hand saw. In this case cut the floorboards face up.

Step 7.
PSTARTING THE SECOND ROW : Use a cut piece of board from the previous row to start the next row. This must be at least 30 cm long. If this piece is too short start with a new board cut in half. Always ensure that the end joints are staggered at least 30 cm.

Step 8.
CONTINUE LAYING THE FLOOR : Place the floorboard at an angle against the floorboard in the previous row, press forward and fold down at the same time.
Step 9.
Place the short end of the floorboard at an angle against the previous installed floorboard and fold down.
Ensure that the board is positioned on the integral locking strip of the floorboard in the previous row.
Step 10.
Lift the floorboard (together with the previous laid in the same row) slightly up (about 30 mm) and push it against the row in front. Put it down when the floorboards are positioned tightly together.
Step 11.
To lay the last row: measure and cut the board. Leave 8- 10 mm to the wall.
Step 12.
Holes for pipes: measure the diameter of the pipe and drill a hole that is 10 mm larger. Saw off a piece shown in the figure and lay the board in place on the floor. Then lay the sawed-off piece in place.
Routing Cleaning
         Simply dust mop or vacuum with a soft brush or wood-floor accessory to keep your floor clean from dust or grit.
         A DAMP cloth or mop canbe used without damage to the laminate panels,but NEVER flood the floor.
         Dry the floor thoroughly with a clean ,soft cloth.
         Blot up spills or water from wet feet or footwear immediately with a clean ,dry cloth,sponge,or paper towel.DO NOT allow excess liquid to remain on the floor’s surface.
         Do not use soap-based detergents,abrasive cleaners,or combined “clean and shine”products on your laminate floor.
         Do not use steel wool or other scouring pads that may scratch laminate panels.
         Do not wax or polish your laminate flooring.
         Do not steam clean or use chemicals that may damage the flooring surface..
 
Care and Maintenance
While your laminate flooring is highly  resistant to stains and abrasions,it is not indestructible,In order to maximize the durability and beauty of your laminate floor,we recommend the following practices as part of your floor’s normal care and maintenance.
         Place a doormat outside the exterior entrances to collect excess moisture,sand,grit and other potentially damaging substances from being tracked onto your laminate floor.
         Use only colorfast and non-scratch carpeting or pads on your laminate surface.
         Avoid sharp or pointed objects with concentrated weight such as high heels on your floor.
         Use protective felt pads uder furniture legs or wide casters under applicance levelers.
If using a wheeled dolly to move furniture or apllicances on your laminate floor,place a clean sheet of smooth plywood or other protective later over your laminate surface.
         Rearrange furniture occasionally for increased indentation resistance.
         Do not treat or seal your laminate floor panels after they are installed.
         Never sand,lacquer,or refinish your laminate flooring surfaces.
 
Important
Acclimate laminate packages for 48 hours in the room where floor is to be installed.Room temperature of at least 18C is essential for installation.
The following climatic conditions within the room must be ensured before ,during and for at least three days following installation:floor surface at least 15.C air temperature at least 18.C air humidity not over 75% Warning!
Check every panel for defects before fitting.No refunds can be made for defective panels once installed.
 
 
Copyright © 2002-2009 Changzhou Jiaan Decorative Material CO.,LTD.    ICP NO.05008373    Designed By:Chuanglian    [ADMIN]